Moggill Constructions - Civil engineering and building since 1973.

projects

Nambour Landfill - Intermediate Liner

Project Description

Moggill completed the 20,000m2 intermediate liner at the Nambour Landfill, using GCL as the liner. Moggill carried out all site operations with direct hire labour.

This included:

  • Earthworks;
  • Drainage;
  • Site Preparation including the safe removal and disposal of asbestos material.;
  • laying of a GCL liner;
  • spreading of a 300mm cover aggregate; 
  • installation a leachate drain;

Being an existing landfill site, landfill gasses (including Methane) were a significant hazard so monitoring of levels was required to ensure a safe working environment. 

Laser controlled machinery was used on the Nambour Landfill site.

BACK TO PROJECTS

Project Details

Client
Sunshine Coast Regional Council

Contract value
$820,000

Project Status
Completed

Project Category
Environmental